All nails and staples should be placed on the lower half of the paper.
Nailing pattern for roof felt.
Bsd 321 handout fastening schedule.
This way i don t get chewed out by the building inspector when they show up to inspect that particular.
Pick up the roll with both hands.
Contact roofhelp 12 24 nailing pattern for roofing felt each row of nails that are 24 on center should be approximately 12 from the outside edge of the roll.
Be sure that there are no wrinkles.
Roof rafters to ridge valley 2 16d common end nail.
From behind the roll reach over and nail down the top of the strip with roofing nails spaced 6 to 8 inches apart.
Roll out the felt toward the other end of the roof.
Rafter or roof truss to top plate table and section 2308 7 5 3 10 common 316d box 410d box 43 x0 131 nails 4 3 14 gage staples 7 16 crown toenail c 7.
Pull straighten and align the felt along the eaves.
Installing roof felt is a two person job.
Nail metal drip edge flashing which bends over the roof and down the edge of the facing board on all roof edges.
The top edge of the felt should be nailed no less than every eight inches.
Fasten drip edge on eaves with.
Space each nail apart by about 30 to 36 inches 76 to 91 cm along the side of the felt closest to the roof s peak and 12 inch 30 5 cm along the side closest to the ground.
Starting a roof with tarpaper felt.
Where a roll ends and a new one is begun the two rolls should be overlapped by four inches.
Valley ridges and hips should have a 6 inch overlap of paper.
The paper should then be nailed in or stapled every three to four inches across.
Nail the middle and bottom of the felt similarly.
Contact roofhelp 9 18 nailing pattern for roofing felt each row of nails that are 18 on center should be approximately 12 from the outside edge of the roll.
I like to give them a call about any new nailing schedules that i m uncertain about.
This video walks through the very basic steps for installing tarpaper felt.
X research source small sheds usually require about 100 to 150 clout nails.
Anchor the top corner of the felt after it has been properly positioned and roll the felt out across the roof.