Roof rafters to ridge valley 2 16d common end nail.
Nail pattern for roofing felt.
Use a construction stapler or a hammer.
The wsu should overhang the drip edge by 1 2 inch so snap a line that is 35 1 2 inches above the drip edge.
The paper should then be nailed in or stapled every three to four inches across.
Put fasteners at least every 8 inches.
It does not have to be perfect but you may need to realign the drip edge.
The overhang to the next strip should be 3 8 inch.
Pay careful attention to roll the felt out smoothly avoiding wrinkles as you move across the roof.
Check at several points to make sure the overhang is consistent.
Contact roofhelp 12 24 nailing pattern for roofing felt each row of nails that are 24 on center should be approximately 12 from the outside edge of the roll.
Roll out about 10 feet of felt and fasten with staples or roofing nails with plastic washer heads.
Where a roll ends and a new one is begun the two rolls should be overlapped by four inches.
All nails and staples should be placed on the lower half of the paper.
The top edge of the felt should be nailed no less than every eight inches.
Bsd 321 handout fastening schedule.
Anchor the top corner of the felt after it has been properly positioned and roll the felt out across the roof.