An air gap in the rafters is not required as long as there is a channel for water drainage to run down the roof this can be achieved with counter battens that run vertically down the roof.
Minimum air gap on roof.
Maximum benefit from as much of the rafter depth as possible means the under rafter insulation layer can be kept to a minimum making installation easier.
Duo pitch roofs greater than 20 0 pitch or greater than 10m span should have additional ventilation at the ridge to assist airflow through the roof void equivalent to at least a 3 mm wide continuous gap.
Air gap clearance for roof mounted solar panels permalink hi what is the general consensus on the minimum roof to solar panel clearance to allow for sufficient cooling airflow.
If 180mm is to be installed then 100mm board might be introduced between the rafters there has to be a minimum 25mm air gap between the insulation and the underside of the tiles or slates with an 80mm board running across the rafters.
The air gap dimensions shown on the drawings are the minimum widths required for clear continuous ventilation air paths at the eaves.
All existing insulation and dust must be removed first to allow for a good bond.
Top up with other insulation afterwards.
With a warm roof the usual process is to split the insulation into two layers.
A minimum of 50 mm 2 in is needed.
Spray foam contractors can install closed cell foam between the joists to air seal and add insulation at the same time to the ceiling.
For more information on pitched roof insulation please see the kingspan kooltherm k7 pitched roof board brochure.
Clearances 1 except as provided in sentence 2 where venting is provided to a roof joist space not less than 63 mm of space shall be provided between the top of the insulation and the underside of the roof sheathing.
Minimum thickness for roof baffle gap here s what the code i work under has to say.